So I dont bore anyone with the long drwan out reason for doing this, I am trying to move content between two databases. Same table setup, basically its a stage and production type of setup. I want to take the content from stage and move it to production, but I cant simply overwrite all the tables, some have information that needs to stay on production. So my thought was to compare the number of records on prod and stage, and say there are 2 on prod and 5 on stage, then those last 3 get promoted to prod, but I wanted to compare the id, which is the key field to compare the number, the ids will match between stage and prod. Then after the new content is moved I will update the first two record and turn them offline, or make their status the same as stage.
HELP, any thoughts, this is the toughest part for me.
thanks